WATER SUPPLY AND SEWERAGE CONNECTION CHARGES(As Per M.D's Procs.No.24/E1/97/2003 dt.30-1-2003)
CATEGORY-III:Bulk Supplies vide Memo.No.MD/HMWSSB/BM-20/Bulk Supplies/2011,Dated:12.09.2011.

  1. The size of water supply connection will be decided by the HMWSSB based on the available network and local requirement.
  2. The improvement charges will be levied whereever required.
  3. In addition to the above,charges for Green Bridge,Rain Water Harvesting Consultancy,60 Days Caution deposit and Source improvement charges shall be levied as per board norms.
  4. The applicants having STPs and recycling the water in their premises and the premises falling outside GHMC area,exemption of 80% sewerage connection charges will be decided by the MD/HMWSSB on case to case basis depending on merits.
  5. Subject to special arrangements entered into by the HMWSSB in respect of special consumers as per the Hyderabad Metropolitan Water Supply&Sewerage Regulations,1992.

Type of Water Supply Connection :
Requirement of Water Supply/Day in KL :
Size of Water Supply Connection :


Water Connection Charges:
Sewerage Connection Charges:
60 Days Water consumption charges:
Charges for Augmenting Source i.e.,for 20000/-per KLD :
AMR Meter and Installation Charges:
Green Bridge charges:
Water Supply Improvement Charges:
Sewerage Improvement Charges:
Rain Water Harvesting Consultancy Charges i.e., for RS.2,000/-per KLD:
Main Infra Structure Development Charges: